The ANRE-issued permit marks a key development milestone for the Repono 2 portfolio - Jantzen Renewables’ battery energy storage platform in Romania, designed to strengthen grid stability at the distribution level and provide congestion management services (flexibility services).
Jantzen Renewables, a Danish-Romanian renewable energy developer with a pipeline exceeding 2 GW across Romania, announces that the Romanian Energy Regulatory Authority (ANRE) has issued the Setting Up Permit (Autorizatia de Infiintare) for the Costesti 1 project, a standalone battery energy storage system (BESS) located in Costesti, Arges county. Costesti 1 is the first project in the Company’s Repono 2 portfolio to reach this regulatory milestone.
Repono 2 is Jantzen Renewables’ dedicated platform of distributed battery storage projects connecting at the 20 kV distribution level across Romania. As opposed to the large-scale Repono 1 standalone BESS project (360 MW) in Blejesti, the Repono 2 portfolio takes a different approach - deploying multiple smaller-scale storage units closer to consumption, at the distribution grid level. The portfolio is designed to deliver multiple revenue streams, including energy arbitrage on the day-ahead and intraday markets, as well as ancillary and balancing services. As Romania’s power system integrates rapidly growing volumes of intermittent solar and wind generation, distributed storage assets at the distribution level are becoming crucial for grid stability and the provision of flexibility services.
Razvan Popa, CEO of Jantzen Renewables, commented:
“Receiving the Setting Up Permit for Costesti 1 is an important milestone for our Repono 2 platform. We have built this portfolio from the ground up to deliver what the Romanian grid actually needs – ancillary and balancing services, plus in the future, flexibility services that strengthen grid stability at the distribution level (this is why we also call this platform BESS Flex). We are fully focused on advancing Repono 2 towards construction and commissioning. Romania’s energy transition requires reliable, dispatchable storage, and Jantzen Renewables is committed to delivering it."
Media Contact
Jantzen Renewables
E-mail: jr@jd.dk
Web: jantzenrenewables.com
Jantzen Renewables is a Danish-Romanian renewable energy development company and part of Jantzen Group Denmark. Established in 2020 as a spinout from Jantzen Development, the Company develops large-scale solar, wind, battery storage and hybrid projects . Jantzen Renewables has a diversified pipeline of over 2 GW of renewable energy assets in Romania. In 2024, the Company completed the sale of the 710 MW Helios 1 photovoltaic cluster in Teleorman county to OMV Petrom, one of the largest solar transactions in Southeast Europe. The Company’s battery storage strategy is focused on two complementary platforms: Repono 1, a large-scale standalone BESS project (360 MW) in Blejesti, Teleorman county, which recently reached ready-to-build status; and Repono 2, a portfolio of distributed battery storage projects connecting at the 20 kV distribution level.
